{"id":84747,"date":"2026-01-28T11:17:57","date_gmt":"2026-01-28T09:17:57","guid":{"rendered":"https:\/\/gulftech-news.com\/en\/?p=84747"},"modified":"2026-01-28T11:17:58","modified_gmt":"2026-01-28T09:17:58","slug":"nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project","status":"publish","type":"post","link":"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/","title":{"rendered":"Nextpower Arabia\u00a0to\u00a0Supply 2.25\u00a0GW of\u00a0Smart Solar Trackers to L&amp;T for\u00a0ACWA Power\u00a0Consortium\u2019s\u00a0Bisha Solar\u00a0Project"},"content":{"rendered":"\n<p><em><strong>First landmark project to be fulfilled through newly formed Nextpower Arabia\u00a0joint venture; localized production to support Saudi National Renewable Energy Program<\/strong><\/em><\/p>\n\n\n\n<p><a href=\"https:\/\/nextpower.com\/nextpower-arabia\">Nextpower Arabia<\/a>, the <a href=\"https:\/\/nextpower.com\/post\/press-release\/abunayyan-holding-and-nextpower-complete-formation-of-joint-venture?locale=en-US\">newly formed joint venture<\/a> between Nextpower (Nasdaq: NXT, formerly Nextracker) and Abunayyan Holding, today announced it will provide 2.25 gigawatts (GWp) of advanced solar\u00a0tracking systems to Larsen &amp; Toubro\u00a0(L&amp;T) for the Bisha Solar\u00a0project, one of the largest utility-scale solar plants being developed by an ACWA Power-led consortium. <\/p>\n\n\n\n<p>The project was procured by the Saudi Power Procurement Company (SPPC) as part of Wave 6\u00a0of the Kingdom\u2019s National Renewable Energy Program (NREP) overseen by the Ministry of Energy.<\/p>\n\n\n\n<p>Located in the Asir Province, Bisha is the largest of the Wave 6 solar projects. The project represents a significant addition to Saudi Arabia\u2019s expanding utility-scale portfolio and supports the Kingdom\u2019s long-term energy and decarbonization objectives. This new 2.25 GWp order is the first major project to be fulfilled through the Nextpower Arabia joint venture, which is now fully operational.<\/p>\n\n\n\n<p>Through localized sales, manufacturing, delivery and supply chain capabilities, Nextpower Arabia will support the efficient deployment of utility-scale solar power plants, while advancing industrial development and workforce development in the Middle East and North Africa (MENA) region.<\/p>\n\n\n\n<p><strong>Bharathi Kumar, general manager (Renewable International), L&amp;T, said,<\/strong> \u201cWe have tremendous confidence in Nextpower\u00a0Arabia\u00a0to provide the most advanced utility-grade solar solutions that will help us deliver maximum performance and low-cost clean energy through the new Bisha Solar Plant long into the future. <\/p>\n\n\n\n<p>Localizing the production of these new systems that will form the foundation of the Bisha plant will deliver greater efficiencies throughout the development process while reducing the cost and impact of international shipping.\u201d\u00a0\u00a0<\/p>\n\n\n\n<p><strong>Dan Shugar, founder and CEO, Nextpower, said,<\/strong> \u201cThe MENA region is a top strategic priority for Nextpower. This project builds on our longstanding partnerships with ACWA Power and L&amp;T and marks an important milestone for our new joint venture with Abunayyan Holding. <\/p>\n\n\n\n<p>Through Nextpower Arabia, we are localizing the industry\u2019s most resilient and intelligent solar plant technologies, engineered specifically for the region\u2019s demanding conditions, while strengthening the local supply chain to support Saudi Arabia\u2019s long-term energy transition goals.\u201d<\/p>\n\n\n\n<p><strong>Turki Al-Amri, Nextpower Arabia Chairman and CEO, and Abunayyan Holding CEO, said,<\/strong> \u201cThe Bisha project will significantly contribute to national and regional renewable energy transformation objectives. By manufacturing and producing Nextpower Arabia systems in the Kingdom, we can deliver a wide range of benefits from our newly localized solar supply chain for our development partners while advancing Saudi\u2019s national industrialization strategy.\u201d&nbsp;<\/p>\n\n\n\n<p>Earlier this year, ACWA Power, in a consortium with the Water and Electricity Holding Company (Badeel) and Saudi Aramco Power Company (SAPCO), announced its commitment to invest $8.3 billion to develop seven large-scale renewable energy plants, adding approximately 15 GW of new renewable energy capacity to the Kingdom\u2019s power grid.<\/p>\n\n\n\n<p>Nextpower has&nbsp;a longstanding track record of supporting major utility-scale solar developments in the region, beginning with the 405 MW Sakaka Solar Park in Saudi Arabia in 2018 and now totalling more than 6 GW across the MENA region.<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>First landmark project to be fulfilled through newly formed Nextpower Arabia\u00a0joint venture; localized production to support Saudi National Renewable Energy Program Nextpower Arabia, the newly formed joint venture between Nextpower (Nasdaq: NXT, formerly Nextracker) and Abunayyan Holding, today announced it will provide 2.25 gigawatts (GWp) of advanced solar\u00a0tracking systems to Larsen &amp; Toubro\u00a0(L&amp;T) for the &hellip;<\/p>\n","protected":false},"author":2,"featured_media":84748,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[5031,5030,5032],"class_list":["post-84747","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-acwa","tag-nextpower-arabia","tag-smart-solar-trackers"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Nextpower Arabia\u00a0to\u00a0Supply 2.25\u00a0GW of\u00a0Smart Solar Trackers to L&amp;T for\u00a0ACWA Power\u00a0Consortium\u2019s\u00a0Bisha Solar\u00a0Project - Gulf Tech News<\/title>\n<meta name=\"description\" content=\"Nextpower Arabia to Supply 2.25 GW of Smart Solar Trackers to L&amp;T for ACWA Power Consortium\u2019s Bisha Solar Project\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nextpower Arabia\u00a0to\u00a0Supply 2.25\u00a0GW of\u00a0Smart Solar Trackers to L&amp;T for\u00a0ACWA Power\u00a0Consortium\u2019s\u00a0Bisha Solar\u00a0Project - Gulf Tech News\" \/>\n<meta property=\"og:description\" content=\"Nextpower Arabia to Supply 2.25 GW of Smart Solar Trackers to L&amp;T for ACWA Power Consortium\u2019s Bisha Solar Project\" \/>\n<meta property=\"og:url\" content=\"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Gulf Tech News\" \/>\n<meta property=\"article:published_time\" content=\"2026-01-28T09:17:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-28T09:17:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/gulftech-news.com\/en\/wp-content\/uploads\/2026\/01\/Image-2-scaled.jpg?v=1769591824\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"bessan helmi\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"bessan helmi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/\",\"url\":\"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/\",\"name\":\"Nextpower Arabia\u00a0to\u00a0Supply 2.25\u00a0GW of\u00a0Smart Solar Trackers to L&amp;T for\u00a0ACWA Power\u00a0Consortium\u2019s\u00a0Bisha Solar\u00a0Project - Gulf Tech News\",\"isPartOf\":{\"@id\":\"https:\/\/gulftech-news.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/gulftech-news.com\/en\/wp-content\/uploads\/2026\/01\/Image-2-scaled.jpg?v=1769591824\",\"datePublished\":\"2026-01-28T09:17:57+00:00\",\"dateModified\":\"2026-01-28T09:17:58+00:00\",\"author\":{\"@id\":\"https:\/\/gulftech-news.com\/en\/#\/schema\/person\/c033626e357b2f7e127eac0570ddc05c\"},\"description\":\"Nextpower Arabia to Supply 2.25 GW of Smart Solar Trackers to L&T for ACWA Power Consortium\u2019s Bisha Solar Project\",\"breadcrumb\":{\"@id\":\"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/#primaryimage\",\"url\":\"https:\/\/gulftech-news.com\/en\/wp-content\/uploads\/2026\/01\/Image-2-scaled.jpg?v=1769591824\",\"contentUrl\":\"https:\/\/gulftech-news.com\/en\/wp-content\/uploads\/2026\/01\/Image-2-scaled.jpg?v=1769591824\",\"width\":2560,\"height\":1707,\"caption\":\"Nextpower Arabia\u00a0to\u00a0Supply 2.25\u00a0GW of\u00a0Smart Solar Trackers to L&T for\u00a0ACWA Power\u00a0Consortium\u2019s\u00a0Bisha Solar\u00a0Project\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/gulftech-news.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nextpower Arabia\u00a0to\u00a0Supply 2.25\u00a0GW of\u00a0Smart Solar Trackers to L&amp;T for\u00a0ACWA Power\u00a0Consortium\u2019s\u00a0Bisha Solar\u00a0Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/gulftech-news.com\/en\/#website\",\"url\":\"https:\/\/gulftech-news.com\/en\/\",\"name\":\"Gulf Tech News\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/gulftech-news.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/gulftech-news.com\/en\/#\/schema\/person\/c033626e357b2f7e127eac0570ddc05c\",\"name\":\"bessan helmi\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/gulftech-news.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/bb1e09a6f094e0fa605073926f8ad9eb228a8b0aacd381fda782c562612428cf?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/bb1e09a6f094e0fa605073926f8ad9eb228a8b0aacd381fda782c562612428cf?s=96&d=mm&r=g\",\"caption\":\"bessan helmi\"},\"url\":\"https:\/\/gulftech-news.com\/en\/author\/bessan-helmi\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Nextpower Arabia\u00a0to\u00a0Supply 2.25\u00a0GW of\u00a0Smart Solar Trackers to L&amp;T for\u00a0ACWA Power\u00a0Consortium\u2019s\u00a0Bisha Solar\u00a0Project - Gulf Tech News","description":"Nextpower Arabia to Supply 2.25 GW of Smart Solar Trackers to L&T for ACWA Power Consortium\u2019s Bisha Solar Project","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/","og_locale":"en_US","og_type":"article","og_title":"Nextpower Arabia\u00a0to\u00a0Supply 2.25\u00a0GW of\u00a0Smart Solar Trackers to L&amp;T for\u00a0ACWA Power\u00a0Consortium\u2019s\u00a0Bisha Solar\u00a0Project - Gulf Tech News","og_description":"Nextpower Arabia to Supply 2.25 GW of Smart Solar Trackers to L&T for ACWA Power Consortium\u2019s Bisha Solar Project","og_url":"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/","og_site_name":"Gulf Tech News","article_published_time":"2026-01-28T09:17:57+00:00","article_modified_time":"2026-01-28T09:17:58+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/gulftech-news.com\/en\/wp-content\/uploads\/2026\/01\/Image-2-scaled.jpg?v=1769591824","type":"image\/jpeg"}],"author":"bessan helmi","twitter_card":"summary_large_image","twitter_misc":{"Written by":"bessan helmi","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/","url":"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/","name":"Nextpower Arabia\u00a0to\u00a0Supply 2.25\u00a0GW of\u00a0Smart Solar Trackers to L&amp;T for\u00a0ACWA Power\u00a0Consortium\u2019s\u00a0Bisha Solar\u00a0Project - Gulf Tech News","isPartOf":{"@id":"https:\/\/gulftech-news.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/#primaryimage"},"image":{"@id":"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/#primaryimage"},"thumbnailUrl":"https:\/\/gulftech-news.com\/en\/wp-content\/uploads\/2026\/01\/Image-2-scaled.jpg?v=1769591824","datePublished":"2026-01-28T09:17:57+00:00","dateModified":"2026-01-28T09:17:58+00:00","author":{"@id":"https:\/\/gulftech-news.com\/en\/#\/schema\/person\/c033626e357b2f7e127eac0570ddc05c"},"description":"Nextpower Arabia to Supply 2.25 GW of Smart Solar Trackers to L&T for ACWA Power Consortium\u2019s Bisha Solar Project","breadcrumb":{"@id":"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/#primaryimage","url":"https:\/\/gulftech-news.com\/en\/wp-content\/uploads\/2026\/01\/Image-2-scaled.jpg?v=1769591824","contentUrl":"https:\/\/gulftech-news.com\/en\/wp-content\/uploads\/2026\/01\/Image-2-scaled.jpg?v=1769591824","width":2560,"height":1707,"caption":"Nextpower Arabia\u00a0to\u00a0Supply 2.25\u00a0GW of\u00a0Smart Solar Trackers to L&T for\u00a0ACWA Power\u00a0Consortium\u2019s\u00a0Bisha Solar\u00a0Project"},{"@type":"BreadcrumbList","@id":"https:\/\/gulftech-news.com\/en\/2026\/01\/28\/nextpower-arabia-to-supply-2-25-gw-of-smart-solar-trackers-to-lt-for-acwa-power-consortiums-bisha-solar-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/gulftech-news.com\/en\/"},{"@type":"ListItem","position":2,"name":"Nextpower Arabia\u00a0to\u00a0Supply 2.25\u00a0GW of\u00a0Smart Solar Trackers to L&amp;T for\u00a0ACWA Power\u00a0Consortium\u2019s\u00a0Bisha Solar\u00a0Project"}]},{"@type":"WebSite","@id":"https:\/\/gulftech-news.com\/en\/#website","url":"https:\/\/gulftech-news.com\/en\/","name":"Gulf Tech News","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/gulftech-news.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/gulftech-news.com\/en\/#\/schema\/person\/c033626e357b2f7e127eac0570ddc05c","name":"bessan helmi","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/gulftech-news.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/bb1e09a6f094e0fa605073926f8ad9eb228a8b0aacd381fda782c562612428cf?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/bb1e09a6f094e0fa605073926f8ad9eb228a8b0aacd381fda782c562612428cf?s=96&d=mm&r=g","caption":"bessan helmi"},"url":"https:\/\/gulftech-news.com\/en\/author\/bessan-helmi\/"}]}},"_links":{"self":[{"href":"https:\/\/gulftech-news.com\/en\/wp-json\/wp\/v2\/posts\/84747","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gulftech-news.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gulftech-news.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gulftech-news.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/gulftech-news.com\/en\/wp-json\/wp\/v2\/comments?post=84747"}],"version-history":[{"count":1,"href":"https:\/\/gulftech-news.com\/en\/wp-json\/wp\/v2\/posts\/84747\/revisions"}],"predecessor-version":[{"id":84749,"href":"https:\/\/gulftech-news.com\/en\/wp-json\/wp\/v2\/posts\/84747\/revisions\/84749"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gulftech-news.com\/en\/wp-json\/wp\/v2\/media\/84748"}],"wp:attachment":[{"href":"https:\/\/gulftech-news.com\/en\/wp-json\/wp\/v2\/media?parent=84747"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gulftech-news.com\/en\/wp-json\/wp\/v2\/categories?post=84747"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gulftech-news.com\/en\/wp-json\/wp\/v2\/tags?post=84747"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}